The AH-64D Apache Cyclic is now finished and is in full production. The grip will be as close as possible to the Block II Apache that ED are developing for DCS. It has 2 4-Way HAT switches, 2 3-Way HAT switches, 4 Push Buttons and a 2 Stage Guarded Trigger.
MK2 Base Unit required. 12-16 weeks.